St.Vincent Hospital
.
Value:
.$ 1 700 000
.

Owner:
.St.Vincent Hospital,

Ottawa, Ontario.
.
Completed:
.July, 1994
.
Consultants:
.Engineer:

J.L. Richards & Associates
.
Co-Gen Developer:
Thermal Energy International Ltd.
.
Project Description:
.A 350 K.W. gas engine generator was installed to provide 100% of the minimum load requirements for electric power for the hospital. Heat recovery through a "Flu-Ace" tower was achieved by feeding exhaust gases and flu gases from existing boilers through the "Flu-Ace". One boiler was eliminated as a result with the hot water from the tower used as part of central heating system.

.
The overall result produced a quick payback in capital and an assured supply of electrical power at below market rates.
pixel.GIF (43 bytes)
pixel.GIF (43 bytes) turnbull1.jpg (8828 bytes)
pixel.GIF (43 bytes)
pixel.GIF (43 bytes)Boiler Plant Exterior


pixel.GIF (43 bytes) turnbull1.jpg (8828 bytes)
pixel.GIF (43 bytes)
pixel.GIF (43 bytes)Interior Piping & Controls
upArrow.GIF (374 bytes)