Previous.Return

Home        Contact Us         The Taggart Group

Projects List      Current Projects      Tender Area        

Mary Ann Turnbull
.
Value:
.$ 1 500 000
.
Owner:
.Mary Ann Turnbull
.
Completed:
.March, 1996
.
Consultants:
.Architect:

Barry J. Hobin
.
Mechanical & Electrical Engineer:
Leslie Jones & Assoc.
.
Project Description:
.New 20 000 sq. ft. facility to provide a superior education environment for primary grades with smaller class sizes. The Hobin designed school building is reminiscent of a charming red brick schoolhouse, but in modern terms. The physical features provide warm and sunfilled spaces, while bright colours enhance the interior.

The facility features a wood frame structure on a concrete hollow core floor assembly and multi-zoned mechanical systems to provide maximum interior comfort.
Doran completed this project under a construction management contract achieving all budget guidelines within a seven month construction schedule.



pixel.GIF (43 bytes)
pixel.GIF (43 bytes) turnbull1.jpg (8828 bytes)
pixel.GIF (43 bytes)
pixel.GIF (43 bytes)Front Entrance Exterior
pixel.GIF (43 bytes)
pixel.GIF (43 bytes) turnbull.jpg (11505 bytes)
pixel.GIF (43 bytes)
pixel.GIF (43 bytes)Rear Elevation
upArrow.GIF (374 bytes)